This new fitout was on an upper level, the challege was to get the materials to the correct level with out disrupting the existing Tenants
- Office area: USG Grid system Two way exposed and Mars 1200x600 Square Edged tiles
- Kitchen area and Bathrooms: USG screw fix system and we supplied and fixed the gib linings